Djen Djen Port Sets New Loading Record

ميناء جن جن يشحن نحو 19 ألف طن من الحديد المختزل إلى ألمانيا
Photo via Echoroukonline

The port of Djen Djen, located in Wilaya de Jijel, set a new loading record on 5 November 2026. Official data confirms the facility exported 18,975 tons of cold-reduced iron in less than 24 hours. This cargo operation represents the highest volume of iron processed at the site within a single day. The shipment was destined for HANSAPORT in Hamburg, Germany, following a logistics agreement managed by MED INTERNATIONAL HOLDING SPA. Ali Fodil and Rachid Fodil confirmed the completion of the loading process, which utilized the port's specialized handling infrastructure. Port authorities completed the export cycle under the 24-hour threshold, marking a shift in the operational capacity of the facility.

Details of Loading Operation

Operational teams initiated the loading process on 2 November 2026. Staff at the Djen Djen port worked continuously to prepare the vessel for its scheduled departure. The port of Djen Djen exported 18,975 tons of cold-reduced iron in less than 24 hours on November 5, 2026. This specific achievement notes the technical capabilities currently available at the Wilaya de Jijel facility. The port’s infrastructure allowed for the continuous handling of the heavy industrial materials throughout the designated timeframe.

Workers loaded the total cargo of 50,000 tons of cold-reduced iron onto the ship named BULK PRUDENCE. MED INTERNATIONAL HOLDING SPA managed the logistics and oversight for this specific transport operation. The loading of the 50,000 tons of cold-reduced iron required precise coordination between the ground crews and the logistics management team. The cargo was loaded onto the ship BULK PRUDENCE for the company MED INTERNATIONAL HOLDING SPA. This vessel, the BULK PRUDENCE, served as the primary carrier for the industrial goods during this multi-day operation.

The shipment is destined for the HANSAPORT terminal located in Hamburg, Germany. This delivery remains part of the trade arrangements established by MED INTERNATIONAL HOLDING SPA to facilitate the movement of industrial materials between the two regions. The shipment is destined for the HANSAPORT terminal in Hamburg, Germany. By moving the total shipment of 50,000 tons of cold-reduced iron, the port of Djen Djen has fulfilled a significant portion of its current logistical commitments. The loading operation began on November 2, 2026, and continued until the vessel was fully prepared for its transit to the HANSAPORT terminal.

The coordination involved in the loading of the BULK PRUDENCE reflects the ongoing collaboration between the port authorities in Wilaya de Jijel and MED INTERNATIONAL HOLDING SPA. The completion of the export cycle for the 50,000 tons of cold-reduced iron signifies the conclusion of the operational phase that commenced on November 2, 2026. As the BULK PRUDENCE departs for the HANSAPORT terminal, the port of Djen Djen continues to monitor its infrastructure performance following the handling of the 18,975 tons recorded on November 5, 2026. The logistical framework provided by MED INTERNATIONAL HOLDING SPA ensures that the industrial materials reach the HANSAPORT facility in Hamburg, Germany, according to the established schedule.